top of page
Ultracruiser Build Status
Build Status 2018-10-23
Starboard wing complete. Requires lower wing repair.
Center section spar and rib parts fabricated but not assembled.
Port wing ribs fabricated but no assembled.
Fuselage bulkheads fabricated.
Ultracruiser Build: FAQ
Hummel Ultralcruiser Build
Ultracruiser Construction Videos and Photos
These will be populated when the build resumes.
​
FAQ Ultracruiser
This will be populated when the build resumes.
Ultracruiser Build: Services
Ultracruiser Build: Gallery
Ultracruiser Build: FAQ
bottom of page